Follow Us
DAC 2013 AUSTIN, TX | JUNE 2-6

Front-end Topics

Filter By Topic     

Verification Management Eases Those Re-spin Worries

Thursday, October 13, 2011
By: Darron May / Mentor Graphics
Topic: Front-End — Sub-topic: Verification

Summary

An effective verification management system requires technology to manage the process, tools and data. Such a system should be anchored in the verification plan, which in turn is closely linked to the design specification. And the verification management tool should enable electronic closure of the verification plan by providing tools that both reduce the volume of data and give deeper visibility and control. Questa's verification management delivers all this in an environment that is modular, flexible and open. But perhaps its most attractive feature is that its various capabilities are assembled with one overarching goal in mind: to give IC design teams the best chance of producing silicon right the first time.

Download PDF



All front-end topics

Design Automation Conference Sponsors IEEE Solid State Circuits Society Electronic Design Automation Consortium CEDA - IEEE Council on Electronic Design Automation SIGDA Special Interest Group - Design Automation